Home Products  |  Pics  |  Other  |  Installation Test & Dig












           Original ForeHoe digging a foundation for double car garage. Ground was very dry and hard.  Spade would not stand up after jabbing it into the ground. Used soaker hose to soften the soil.
      

 








 




Installing water hydrant
 




    

         
 










This ditch was for a 4" drainage pipe and was dug
    by setting the bucket and backing out several times.











   




    Start digging a trash pit in relatively soft moist soil
    Note: Spade in background



   







       



    ForeHoe bucket back at tractor after digging













    Unloading to the right












    After 30 minutes of machine time
Approximately 3' deep











   Another view










View showing side wall











    Pit dimensions 30" wide x 5' deep x 11' long
    after 1 1/2 hours of machine time












Home 
Products  |  Pics  |  Other  |  Installation Test & Dig